DM Composites delivered a complete FRP solution, transforming the site with defect rectification, DDA-compliant upgrades, and a new elevated boardwalk engineered for strength, safety, and low maintenance. Custom retrofits ensured seamless integration and a consistent aesthetic across all stages.
LOCATION
The 1001 Steps walking track at Bayview Park has long been one of Melbourne’s most popular urban bushland trails, attracting walkers, fitness enthusiasts, and families alike. Nestled in parklands just 38km south-east of the Melbourne CBD, the track climbs steeply through a green corridor, offering sweeping views across the suburbs and out to the Dandenong Ranges.
OUTCOME
DM Composites was engaged to design, supply, and construct the next phase, a 1.5km fully elevated FRP boardwalk and balustrade system that would deliver durability, accessibility, and a seamless connection between Stage 1 and Stage 2.
CONSTRUCTION CHALLENGES AND Solutions
CASE STUDY PDF
1001 Steps Bayview Park Elevated FRP Boardwalk
Download the full case study covering scope, delivery approach, and outcomes.