Settlement point reserve

DM Composites designed and supplied a prefabricated FRP stairway and canoe-accessible ramp at Settlement Point Reserve, improving safe and inclusive access to the Hastings River in a flood-prone environment.

LOCATION

Located along the Hastings River foreshore in Port Macquarie, Settlement Point Reserve is a well-used community space for recreation and kayaking that has been significantly affected by flooding and riverbank erosion over the past decade, prompting a major council-led restoration and flood recovery program to improve resilience and restore public access to the riverfront.

OUTCOME

Prefabricated FRP access structures installed to provide durable, flood-resilient river access.

CHALLENGES AND Solutions

CASE STUDY PDF

Settlement Point Reserve

Download the full case study covering scope, delivery approach, and outcomes.

View Full Case Study
PDF Document

The site required a resilient access system that could withstand frequent flooding, unstable ground conditions, and ongoing public use.

Flood-resilient FRP design 
Performs reliably under repeated inundation and fluctuating river levels.

Ground-adaptive foundations
Screw piles provide stability in soft floodplain soils while minimising ground disturbance.


Safe public access
Non-slip FRP surfaces support safe use for canoe users, pedestrians, and mobility aids.

Long-term durability
A low-maintenance system designed to support reliable public access over the asset’s lifecycle.

100

%

Let’s Build with DMCOMPOSITES™