Settlement point reserve

DM Composites designed and supplied a prefabricated FRP stairway and canoe-accessible ramp at Settlement Point Reserve, improving safe and inclusive access to the Hastings River in a flood-prone environment.

LOCATION

Located along the Hastings River foreshore in Port Macquarie, Settlement Point Reserve is a well-used community space for recreation and kayaking that has been significantly affected by flooding and riverbank erosion over the past decade, prompting a major council-led restoration and flood recovery program to improve resilience and restore public access to the riverfront.

OUTCOME

Prefabricated FRP access structures installed to provide durable, flood-resilient river access.

CHALLENGES AND Solutions

The site required a resilient access system that could withstand frequent flooding, unstable ground conditions, and ongoing public use.

Flood-resilient FRP design 
Performs reliably under repeated inundation and fluctuating river levels.

Ground-adaptive foundations
Screw piles provide stability in soft floodplain soils while minimising ground disturbance.


Safe public access
Non-slip FRP surfaces support safe use for canoe users, pedestrians, and mobility aids.

Long-term durability
A low-maintenance system designed to support reliable public access over the asset’s lifecycle.

100

%

Let’s Build with DMCOMPOSITES™