As part of the CLIRP (Community Local Infrastructure Recovery Package), DM Composites was engaged to deliver the full design and replacement of critical pedestrian access structures within King George V Memorial Park, Gloucester. The original timber walkway and stair network, heavily impacted by regional flood events, required full demolition and replacement to restore safe access and enhance long-term durability.
CHALLENGES AND Solutions
Flood vulnerability:
The new system required enhanced structural resilience and corrosion resistance.
Access limitations
Sloped parkland terrain and proximity to a watercourse presented site logistics and installation challenges.
Environmental constraints
Vegetation, habitat protection, and stormwater management controls were strictly enforced.